Sæteråsen site visits for bulk sample
Mineral Holding successfully collected a ~500kg bulk sample from the Sæteråsen deposit with permission from the Landowner.
The samples were collected using a sledge hammer at four different locations, collecting ~125 kg from each. The work took in total two days and were transported to car by backpack with 15-20kg payloads.
The bulk sample is intended for use in a metallurgical testwork to identify a practical extraction method and yield for niobium, zirconium and REE concentrates.

